Project Overview

SmartScape IV irrigation was installed during the Fall of 2023 and plants were installed in Winter/Spring of 2024. It features only low water use (as defined as per the WUCOLS database), water conserving plant and shrub species.

The design and installation of SmartScape IV complies with the Model Water Efficient Landscape Ordinance (MWELO). This means that the area has a calculated water budget via MWELO standards, and must perform within or below this water budget.

The landscape is divided into two main hydrozones, SmartScape IV East, which is is point-source surface irrigation, and SmartScape IV West, which is surface drip irrigation. As per MWELO, the trees located in SmartScape IV are on their own hydrozone/valve.

SmartScape IV plant species list

 


SmartScape IV 2024 Water Applied Data

Below, readers can find the 2024 water applied data and key findings for SmartScape IV at SmartLandscape. We consider this an "establishment year". 

SS4 West
SS4 East

 


Photos

Irrigation Intallation

irrigation 1
Interns installing point-source irrigation line in Fall 2023.
irrigation 2
Interns installing point-source irrigation line in Fall 2023.
irrigation 3
Irrigation testing in Fall 2023.
planting 1
Interns planting in Spring 2024.
planting 2
Interns planting in Spring 2024.
spring interns
Spring 2024 interns in SmartScape IV.
mulched
Interns after mulching SmartScape IV in Spring, 2024.
update 1
SmartScape IV update photo, Verbena bonariensis, Fall 2024.
update 2
SmartScape IV update photo, Fall 2024.